Much happened last week but not much building from me – Tash arrived last weekend and after an emotional reunion we spent a precious week rebalancing and finding out what we’d been unable to imagine about the other’s separate existence. Tash for instance found out that my cabin is fully equipped with a dedicated toastingContinue reading “Something completely different”
Category Archives: Uncategorized
The end of another week
Thursday: my day’s work seemed minimal, though I completed the garage insulation in the west gable, above the platform. I realised I’d forgotten to add a hot water outlet for the proposed outside shower, so quickly bent some 15mm pipe and left it in a T to remind me it needed fitting. I also wonderedContinue reading “The end of another week”
Days 32, 33, 34
Monday13 July Like a Chinese puzzle I turn the hot water plumbing round and over in my mind, trying to see how to fit it now the cold pipes are in place. I don’t think I can solder it all in-situ so will have to join most of it nearby then manoeuvre it into placeContinue reading “Days 32, 33, 34”
Moving up…
A busy and productive week, though not without a heart stopping moment when Andrew told me there was a mistake in the rafter manufacture, they were too short… The moment passed as it turned out raising the walls with a couple of battens would take up the shortfall – the cut to form the horizontalContinue reading “Moving up…”
Monday, Tuesday, Wednesday
Monday 6 – Weds 8 July Sunrise and the view east over the loch is now framed by a three metre sliding window (left above), delicately muscled into position by the big telehandler, two pairs of hands and careful thought. The larger sliding window – frame and everything – weighs about a tonne… I’d consideredContinue reading “Monday, Tuesday, Wednesday”
Friday 3 July
Wednesday 2 July. In February we all thought Tash and I would be taking over the wind and weather tight house a month ago… After pinging three blue chalkline guides onto the new chipboard floor I tried to become a human machine, putting screws in as quickly and accurately as possible. I finished a boxContinue reading “Friday 3 July”
Beginning at last…
Monday 29 June My first day building – I got out to the car, hoping I had all I needed, but went back for the waterproof phone case. It looked like rain. As it turned out the low cloud burned off and by midday sunstroke was more likely than drowning. With new electric tools, advice fromContinue reading “Beginning at last…”
25 and 26 June
Yesterday the exposed edges of the Isoquick foundation trays of both garage and house were rendered with a lime mortar mix, two thin coats, applied with a standard steel plastering trowel. To compliment the lime’s flexible quality a fine plastic reinforcing mesh was pushed into the first layer – through which the mortar squeezed asContinue reading “25 and 26 June”
24 June 2020 – Third week
Grey and damp, light breeze. Cloud not quite so low. A fat brown vole ran across the track by the gate. My third sighting. Roof trusses set up -with the aid of the telehandler – supporting the western end of the glulam ridge. A bigger machine will be needed for the house ridge beam, whichContinue reading “24 June 2020 – Third week”
19 June 2020: the end of week 2
…a second thrilling week. On site the head binder is finished and rafters have been fitted over the entrance/utility room. It will soon be a useful dry store. After one long ‘office’ session I arrived on site, expecting to see one large sliding window in place, with one of the regular windows beside it soContinue reading “19 June 2020: the end of week 2”